r3-legacy/bak/r3-graphics-runtime-impact.js

117 lines
3.1 KiB
JavaScript
Raw Normal View History

2018-04-09 09:35:04 +02:00
/**
* R3.GraphicsRuntime.Impact
* @param apiGraphicsRuntimeImpact
* @constructor
*/
2019-07-24 08:08:02 +02:00
R3.GraphicsRuntime.Impact = function(
2018-04-09 09:35:04 +02:00
apiGraphicsRuntimeImpact
) {
if (R3.Utils.UndefinedOrNull(apiGraphicsRuntimeImpact)) {
apiGraphicsRuntimeImpact = {
graphicsType : R3.API.GraphicsRuntime.GRAPHICS_TYPE_IMPACT_JS
};
}
R3.API.GraphicsRuntime.Impact.call(
this,
apiGraphicsRuntimeImpact
);
R3.GraphicsRuntime.call(
this,
this
);
};
R3.GraphicsRuntime.Impact.prototype = Object.create(R3.GraphicsRuntime.prototype);
R3.GraphicsRuntime.Impact.prototype.constructor = R3.GraphicsRuntime.Impact;
/**
* Create R3.GraphicsRuntime.Impact Instance
* @returns {*}
*/
R3.GraphicsRuntime.Impact.prototype.createInstance = function() {
this.instance = ig;
/**
2018-04-09 09:38:36 +02:00
* We override the game load to lookup the canvas from our r3 and not the DOM, since our canvas
2018-04-09 09:35:04 +02:00
* does not necessarily live inside the DOM
*/
ig.System.inject({
init : function( canvasId, fps, width, height, scale ) {
this.fps = fps;
this.clock = new ig.Timer();
this.canvas = R3.EntityManager.Instance.findComponentById(canvasId).instance;
this.resize( width, height, scale );
this.context = this.canvas.getContext('2d');
this.getDrawPos = ig.System.drawMode;
// Automatically switch to crisp scaling when using a scale
// other than 1
if( this.scale !== 1 ) {
ig.System.scaleMode = ig.System.SCALE.CRISP;
}
ig.System.scaleMode( this.canvas, this.context );
}
});
/**
* We override image loading to specify that it loads from cross-origins
*/
ig.Image.inject({
load: function( loadCallback ) {
if( this.loaded ) {
if( loadCallback ) {
loadCallback( this.path, true );
}
return;
}
else if( !this.loaded && ig.ready ) {
this.loadCallback = loadCallback || null;
this.data = new Image();
this.data.crossOrigin = 'anonymous';
this.data.onload = this.onload.bind(this);
this.data.onerror = this.onerror.bind(this);
this.data.src = ig.prefix + this.path + ig.nocache;
}
else {
ig.addResource( this );
}
ig.Image.cache[this.path] = this;
}
});
R3.GraphicsRuntime.prototype.createInstance.call(this);
};
/**
* Update GraphicsRuntime.Impact Instance
*/
R3.GraphicsRuntime.Impact.prototype.updateInstance = function(property) {
R3.GraphicsRuntime.prototype.updateInstance.call(this, property);
};
/**
*
* @returns {R3.API.GraphicsRuntime.Impact}
*/
R3.GraphicsRuntime.Impact.prototype.toApiObject = function() {
var apiGraphicsRuntime = R3.GraphicsRuntime.prototype.toApiObject.call(this);
var apiGraphicsRuntimeImpact = new R3.API.GraphicsRuntime.Impact(
apiGraphicsRuntime
);
return apiGraphicsRuntimeImpact;
};